logo
Good price  online

products details

Home > Products >
DC EV Charger
>
Industrial Grade Salt Spray Vibration Tested DC EV Charger TOU Tariff Multi Level Authority Management

Industrial Grade Salt Spray Vibration Tested DC EV Charger TOU Tariff Multi Level Authority Management

Brand Name: Mckee Charging Cube
Model Number: CLF-DC-120KW
MOQ: 1
Price: Negotiate
Packaging Details: Wooden case packaging
Payment Terms: L/C,D/A,D/P,T/T
Detail Information
Place of Origin:
Luoyang, China
Certification:
CE
Rated Power:
60kW/120kW/160kW/240kW
Input Voltage:
AC380V ±15%, Three Phase Four Wire
Output Voltage:
200-750V DC
Max Output Current:
250A Per Gun
Charging Guns:
Two, CCS1/CCS2/CHAdeMO/GB/T
Reliability Tests:
Temperature Cycling, Damp Heat, Salt Spray, Vibration, Full Machine
Reservation Function:
Built-in, Per Gun, Time-of-use Tariff Linked
Off-Peak Guidance:
Tariff Window Based Push To Display And App
Authority Levels:
Super Administrator, Maintenance Technician, End User
Operation Log:
Full Trace With Account, Action, Timestamp And Result
Peak Efficiency:
≥96%
Protection Grade:
IP55
Cooling Method:
Air Cooling
Operating Temperature:
-30℃ To +55℃
Communication:
4G/Ethernet, OCPP 1.6J
Display:
7 Inch Touch Screen
Cable Length:
5m
Enclosure Finish:
Heavy-duty Corrosion-resistant Polyester Powder Coating
Installation:
Floor Mounted
Highlight:

Salt Spray Tested DC EV Charger

,

Vibration Tested DC EV Charger

,

TOU Tariff DC EV Charger

Product Description

Industrial Grade Dual Gun DC EV Charger with TOU Guidance and Multi Level Authority Management

This floor mounted DC fast charging station is built for networks that run in difficult places and are operated by several teams at once. The cabinet is qualified through full-machine reliability testing, the controller supports time-of-use driven off-peak guidance, and the management platform separates duties across administrator, technician and driver accounts with complete operation logging.

1. Reservation Function with Time-of-Use Off-Peak Guidance

The built-in reservation module works together with local time-of-use tariffs. Drivers book a charging window in advance, and the system guides them toward low-price periods through the display and the mobile app, so demand is spread across the day instead of piling up at the evening peak.

  • Reservation slots configurable per gun and per tariff period
  • Off-peak guidance push based on time-of-use price windows
  • Smoother station load curve and lower peak electricity cost
  • Higher equipment utilization during valley hours

2. Full-Machine Reliability Testing to Industrial Grade Standard

Every cabinet design is validated as a complete machine, not as individual boards. The qualification program covers high and low temperature cycling, damp heat, salt spray and vibration, matching industrial-grade outdoor durability requirements, so the charger holds up in coastal high-salt areas and high-altitude plateau sites.

  • High and low temperature cycling test for full thermal range operation
  • Damp heat test for humid coastal and southern climates
  • Salt spray test for high-salt coastal and island installations
  • Vibration test for transport and wind loaded outdoor mounting
  • Industrial-grade outdoor durability, stable operation in special environments

3. Multi Level Authority Management and Full Operation Logging

The management platform separates accounts into super administrator, maintenance technician and end user levels, each with its own permission scope. Every configuration change, fault acknowledgement, remote command and firmware action is written to the operation log, so large charging networks can run with clear accountability.

  • Super administrator: full rights across the network and account management
  • Maintenance technician: local diagnostics, firmware and parameter access only
  • End user: charging, reservation and personal billing records only
  • Full operation log tracing with time, account, action and result
  • Refined operation management for multi-site and franchise networks

Industrial Grade Salt Spray Vibration Tested DC EV Charger TOU Tariff Multi Level Authority Management

Industrial Grade Salt Spray Vibration Tested DC EV Charger TOU Tariff Multi Level Authority Management

Industrial Grade Salt Spray Vibration Tested DC EV Charger TOU Tariff Multi Level Authority Management

Technical Parameters

Rated Power 60kW / 120kW / 160kW / 240kW
Input Voltage AC380V ±15%, three phase four wire
Output Voltage 200-750V DC
Max Output Current 250A per gun
Charging Guns Two, CCS1 / CCS2 / CHAdeMO / GB/T optional
Reliability Tests Temperature cycling, damp heat, salt spray, vibration, full machine
Reservation Function Built-in, per gun, time-of-use tariff linked
Authority Levels Super administrator, maintenance technician, end user
Operation Log Full trace: account, action, timestamp, result
Peak Efficiency ≥96%
Protection Grade IP55
Operating Temperature -30°C to +55°C
Communication 4G / Ethernet, OCPP 1.6J
Enclosure Finish Heavy-duty corrosion-resistant polyester powder coating

Application Scenarios

Coastal high-salt highways and ports, high-altitude plateau routes, large multi-site charging networks, franchise operated public stations and municipal projects that require documented operation and maintenance records.

About McKee

Mckee is a manufacturer focusing on electric car charging stations and related electric car accessories. Committed to sustainable development since 2011, we constantly aim to adopt clean and green technologies, striving to provide safe and green energy services through technological innovation. We provide complete electric vehicle charging solutions, from innovative energy storage technology to public DC fast charging stations, fast charging stations and portable charging stations for home use. Our infrastructure can meet every type of demand.

Industrial Grade Salt Spray Vibration Tested DC EV Charger TOU Tariff Multi Level Authority Management

Frequently Asked Questions

How long is your delivery time?
For charging posts, it is usually 3-10 days. If there is no stock, the production lead time is determined according to the order quantity. High-power DC charging posts usually need to be customized according to the customer's technical parameters.
How long does it take to customize the prototype?
For charging piles, the prototype time is usually 7 days. For DC charging posts, the prototype time is usually 15 days. For high power fast charging stations, the technical parameters need to be determined before production, and the prototype time is usually 30 days.
How to guarantee the service?
Our products are divided into two categories: household and commercial. For home chargers, we provide standardized service: 1 year warranty + remote installation and usage guidance + video installation tutorial. For commercial chargers, we provide both standardized services and payment software docking services for operating companies.
How do you guarantee the quality of your products?
The charging post products we sell have passed GB certification in China and CE certification in EU. For some other countries, the relevant certifications are in progress.