logo
Good price  online

products details

Home > Products >
DC EV Charger
>
Modular 60kW-240kW Scalable DC EV Charger Dual Gun Time Sharing Power Scheduling

Modular 60kW-240kW Scalable DC EV Charger Dual Gun Time Sharing Power Scheduling

Brand Name: Mckee Charging Cube
Model Number: CLF-DC-240KW
MOQ: 1
Price: Negotiate
Packaging Details: Wooden case packaging
Payment Terms: L/C,D/A,D/P,T/T
Detail Information
Place of Origin:
Luoyang, China
Certification:
CE
Rated Power:
60kW To 240kW, Module Scalable
Power Module:
20kW Hot-swappable Module, Parallel Operation
Input Voltage:
380V ±15%, Three Phase Four Wire
Output Voltage:
200-750V DC
Max Output Current:
250A Per Gun
Charging Guns:
Two, CCS1/CCS2/CHAdeMO/GB/T
Gun Scheduling Mode:
Full Power Single Gun At Peak, Balanced Dual Gun At Flat Hours
Peak Efficiency:
≥96%
Protection Grade:
IP55
Cooling Method:
Air Cooling
Operating Temperature:
-30℃ To +55℃
Communication:
4G/Ethernet, OCPP 1.6J
Display:
7 Inch Touch Screen
Cable Length:
5m
Enclosure Finish:
Heavy-duty Corrosion-resistant Polyester Powder Coating
Installation:
Floor Mounted
Highlight:

60kW-240kW scalable DC EV charger

,

dual gun DC EV charger

,

time sharing power scheduling charger

Product Description

60kW-240kW Modular Dual Gun DC EV Charger

This floor mounted DC fast charging station is engineered for operators who need to enter the fast charging business with limited capital exposure and grow capacity as traffic increases. The cabinet combines a scalable modular power architecture, intelligent dual-gun time-sharing scheduling and a heavy-duty corrosion-resistant coating, making it a practical choice for highway service areas, logistics hubs and city public charging sites.

1. Scalable Modular Power Architecture (60kW to 240kW)

The charger is built on hot-swappable 20kW power modules installed in a single main cabinet. Operators can start with a 60kW entry-level configuration and add modules on site to reach 80kW, 120kW, 160kW, 200kW or 240kW as demand grows. Because the main cabinet, enclosure, cabling and grid connection are reused, capacity expansion never requires replacing the original cabinet or rebuilding the civil works.

  • Start at 60kW, expand in 20kW steps up to 240kW on the same cabinet
  • No main cabinet replacement and no repeated grid upgrade during expansion
  • Lower upfront capital investment and reduced trial risk for new charging stations
  • Module-level redundancy: a single module fault does not stop the whole charger

2. Intelligent Dual-Gun Time-Sharing Scheduling

The charging controller supports configurable dual-gun output strategies, so operators can assign differentiated power allocation for peak and off-peak hours instead of running a fixed split all day.

  • Peak hours: full power delivered to a single gun for the shortest possible charging session and higher bay turnover
  • Flat and off-peak hours: balanced output across both guns so two vehicles charge simultaneously
  • Schedules are editable by time window, weekday and site profile through the local display or the OCPP backend
  • Maximizes per-unit revenue efficiency of each installed kilowatt

3. Heavy-Duty Corrosion-Resistant Powder Coating

The enclosure uses a multi-stage pre-treatment followed by a heavy-duty polyester powder coating designed for high-traffic outdoor scenarios such as highway service areas and logistics hubs. The finish resists oil stains, road dust, salt spray and general atmospheric erosion, so the cabinet keeps its appearance and structural integrity far longer in harsh environments.

  • Multi-layer pre-treatment and thick-film powder coating for outdoor durability
  • Resistant to oil stains, dust, UV exposure and atmospheric corrosion
  • Slower appearance aging, lower refurbishment cost and longer equipment service life

Modular 60kW-240kW Scalable DC EV Charger Dual Gun Time Sharing Power Scheduling

Modular 60kW-240kW Scalable DC EV Charger Dual Gun Time Sharing Power Scheduling

Modular 60kW-240kW Scalable DC EV Charger Dual Gun Time Sharing Power Scheduling

Technical Parameters

Rated Power 60kW / 80kW / 120kW / 160kW / 200kW / 240kW (module scalable)
Power Module 20kW hot-swappable modules, parallel operation
Input Voltage 380V ±15%, three phase four wire
Output Voltage 200-750V DC
Max Output Current 250A per gun
Charging Guns Two guns, CCS1 / CCS2 / CHAdeMO / GB/T optional
Peak Efficiency ≥96%
Protection Grade IP55
Cooling Method Air cooling
Operating Temperature -30°C to +55°C
Communication 4G / Ethernet, OCPP 1.6J
Enclosure Finish Heavy-duty corrosion-resistant polyester powder coating

Application Scenarios

Highway service areas, logistics and distribution hubs, fleet depots, public parking lots, shopping malls and urban roadside charging sites where traffic volume grows year on year.

Service and Support

  • OEM and ODM supported, connector standard and cabinet color configurable
  • OCPP backend and payment software docking support for charging operators
  • Spare power modules shipped with the order for fast field replacement
  • Remote commissioning guidance and video installation tutorial

About McKee

Mckee is a manufacturer focusing on electric car charging stations and related electric car accessories. Committed to sustainable development since 2011, we constantly aim to adopt clean and green technologies, striving to provide safe and green energy services through technological innovation. We provide complete electric vehicle charging solutions, from innovative energy storage technology to public DC fast charging stations, fast charging stations and portable charging stations for home use. Our infrastructure can meet every type of demand.

Modular 60kW-240kW Scalable DC EV Charger Dual Gun Time Sharing Power Scheduling

Frequently Asked Questions

How long is your delivery time?
For charging posts, it is usually 3-10 days. If there is no stock, the production lead time is determined according to the order quantity. High-power DC charging posts usually need to be customized according to the customer's technical parameters.
How long does it take to customize the prototype?
For charging piles, the prototype time is usually 7 days. For DC charging posts, the prototype time is usually 15 days. For high power fast charging stations, the technical parameters need to be determined before production, and the prototype time is usually 30 days.
How to guarantee the service?
Our products are divided into two categories: household and commercial. For home chargers, we provide standardized service: 1 year warranty + remote installation and usage guidance + video installation tutorial. For commercial chargers, we provide both standardized services and payment software docking services for operating companies.
How do you guarantee the quality of your products?
The charging post products we sell have passed GB certification in China and CE certification in EU. For some other countries, the relevant certifications are in progress.