A 240kW dual gun DC fast charging station designed for sites where vehicles arrive in a steady stream and waiting time directly costs revenue. Module level parallel design keeps the station available even when one power unit fails, while the air cooled cabinet and IP55 rating allow permanent outdoor installation on highways, coastal roads and inland corridors.
The CLF-DC-240KW-S converts three phase 380V AC input into a regulated DC output adjustable from 200V to 1000V, delivering up to 250A per gun. Because the output range covers both 400V class passenger cars and 800V high voltage platforms, one cabinet type can be deployed across a whole corridor without checking which vehicle generation will arrive at each site.
Power is drawn from a pool of hot swappable modules. The controller monitors each module and redistributes load automatically, so charging continues at reduced power instead of stopping completely. For operators this means a failed module becomes a scheduled maintenance item rather than an emergency call out, and the site stays open while the replacement is on its way.
| Parameter | Specification |
|---|---|
| Model Number | CLF-DC-240KW-S |
| Rated Power | 240kW total, 120kW per gun |
| Input | 3 phase 5 wire, AC 380V ±15%, 50Hz / 60Hz |
| Output Voltage | DC 200V – 1000V |
| Max Output Current | 250A per gun |
| Connector Standard | CCS1, CCS2, CHAdeMO, GB/T |
| Power Factor | ≥ 0.99 |
| Peak Efficiency | ≥ 96% |
| Power Module Design | Parallel modules, hot swappable, single fault tolerant |
| Cooling Method | Air cooling |
| Protection Grade | IP55 |
| Operating Temperature | -40°C to +60°C |
| Storage Temperature | -40°C to +70°C |
| Relative Humidity | 5% to 95%, non condensing |
| Display | 10 inch high brightness colour touch screen |
| Charging Cable | 5m standard, custom length available |
| Communication Protocol | OCPP 1.6J |
| Network | 4G / Ethernet / WiFi |
| Start Mode | RFID, QR code, VIN, APP, CMS remote start and stop |
| Safety Protection | Short circuit, over temperature, over current, leakage, over voltage, under voltage |
| Metering | DC energy meter with billing data output |
| Installation | Floor mounted outdoor station with concrete foundation |
| Certification | TUV, CE, FCC |
| Place of Origin | Luoyang, China |
Air is drawn through washable filters at the lower front of the cabinet, passes the module heat sinks and leaves through the top exhaust, which keeps the electronics compartment cooler than the ambient air even in summer. Filters are designed for simple removal without tools, and the maintenance interval depends on local dust conditions; dusty inland sites typically clean filters quarterly while coastal sites clean them every six months.
For site planning, allow at least 800mm free space in front of the cabinet for door opening and cable handling, and keep the exhaust side clear so hot air does not recirculate into the intake. A dedicated three phase breaker and surge protection device at the distribution board are recommended, and the foundation should be raised above the local flood line to protect the cable entry gland.
| Item | Detail |
|---|---|
| Minimum Order Quantity | 1 Set |
| Reference Price | USD 14,000 – 19,500 per set, depending on connector mix and configuration |
| Payment Terms | T/T, L/C, Western Union |
| Supply Ability | 150 sets per month |
| Delivery Time | 30 to 35 working days after deposit |
| Packaging | Wooden case with shock proof foam, export grade packing, sea worthy |
| Customisation | OEM / ODM on power allocation, connector mix, housing colour, logo, interface language |
| Documentation | User manual, installation drawing, wiring diagram, test report, certificate copies |
The station is supplied with TUV, CE and FCC certification, which supports grid connection approval, customs clearance and public procurement requirements in most export markets. Standard warranty is 24 months for the complete unit and 12 months for cables and connectors, with extended warranty and spare module packages available for multi site rollouts.
Because the CMS platform reports module level status, our service team can identify a weak module remotely and ship the replacement before a site visit is needed. Typical module replacement takes under an hour with the station powered down at the breaker, which keeps revenue loss on a busy highway site to a minimum.
![]()
![]()
![]()
| Question | Answer |
|---|---|
| Can output power be increased later? | The cabinet is built around modular power units, so additional modules can be added within the design limit. Please discuss the planned final power level at order stage so the enclosure and cabling are matched. |
| What happens if one power module fails? | The controller isolates the faulty module and continues charging on the remaining modules. The fault is reported to the CMS with the module identifier for planned replacement. |
| Is liquid cooling required? | No. The air cooled design is sufficient for the rated continuous output and avoids the service routines associated with coolant circuits. |
| Can one gun be CCS2 and the other GB/T? | Yes. Connector type is selected per gun at order stage, so mixed standard sites are supported. |
| How long does installation take? | With a prepared foundation and power supply, mechanical installation and commissioning normally take one working day for a single unit. |
Tell us the site location, grid capacity, expected daily sessions and the connector standards required by the vehicles using the site. We will propose a matched configuration, confirm the foundation and cable entry drawing, and issue a quotation with lead time and shipping terms. Project pricing is available for multi unit orders, and OEM branding can be applied to the cabinet, screen interface and documentation.
![]()
Specifications are subject to project configuration. Please confirm the final power allocation, connector mix and interface language before ordering.