| Brand Name: | Mckee Charging Cube |
| Model Number: | CLF-DC-180KW |
| MOQ: | 1 |
| Price: | Negotiate |
| Packaging Details: | Wooden case packaging |
| Payment Terms: | T/T,L/C,D/P,D/A |
Most DC chargers are specified on output power and connector count, while the input side determines whether the site can actually be approved and whether the electricity bill carries extra charges. The CLF-DC-180G uses an active front end with a 0.99 input power factor and low total harmonic distortion, so the current drawn from the grid stays close to a clean sine wave instead of the distorted waveform produced by conventional six pulse rectifier front ends.
For industrial parks, that difference decides whether the charger can be connected at all. Park grid codes and utility connection agreements commonly cap harmonic current injection at the point of common coupling; a charger that exceeds the limit forces the operator into filter retrofits, derating or refusal of connection. This unit is designed to stay inside those limits with margin, so approval drawings pass without extra mitigation equipment.
![]()
![]()
![]()
| Model | CLF-DC-180G |
| Series | Minor Snow |
| Rated Power | 180kW |
| Input Power Factor | 0.99 (full load range) |
| Input Current THD | Low harmonic design, active front end |
| Input Voltage | AC 380V ±15%, three phase five wire |
| Output Voltage | DC 200V - 1000V |
| Charging Ports | 2 (dual gun, dynamic sharing) |
| Max Output Current | 250A per gun |
| Protection Grade | IP54 |
| Operating Temperature | -30°C to +55°C |
| Cooling | Intelligent air cooling |
| Communication | OCPP 1.6J, 4G, Ethernet, WiFi |
| Display | 10 inch colour touchscreen |
A 180kW charger without power factor correction draws reactive current that must be carried by park transformers and cables, and injects harmonic current that heats neutral conductors and distorts the voltage supplied to other tenants. Both effects are billed back to the site owner through penalty clauses, transformer oversizing or forced mitigation. A 0.99 power factor active front end removes that cost line from the project business case.
Industrial parks and factory sites with tenant electricity metering, logistics parks sharing a single transformer with production loads, science parks with strict connection agreements, and any site where the utility provider has already issued a harmonic warning to the owner.
Mckee is a manufacturer focusing on electric car charging stations and related electric car accessories. Committed to sustainable development since 2011, we constantly aim to adopt clean and green technologies, striving to provide safe and green energy services through technological innovation. We provide complete electric vehicle charging solutions, from innovative energy storage technology to public DC fast charging stations, fast charging stations and portable charging stations for home use. Our infrastructure can meet every type of demand.
![]()