logo
Good price  online

products details

Home > Products >
DC EV Charger
>
Minor Snow 180kW DC EV Charger 0.99 Input Power Factor Low Harmonic Grid Friendly Industrial Park

Minor Snow 180kW DC EV Charger 0.99 Input Power Factor Low Harmonic Grid Friendly Industrial Park

Brand Name: Mckee Charging Cube
Model Number: CLF-DC-180KW
MOQ: 1
Price: Negotiate
Packaging Details: Wooden case packaging
Payment Terms: T/T,L/C,D/P,D/A
Detail Information
Place of Origin:
Luoyang, China
Certification:
CE
Rated Power:
180kW
Input Power Factor:
0.99
Input Current THD:
Low Harmonic Active Front End
Input Voltage:
AC 380V +/-15%, Three Phase Five Wire
Output Voltage:
DC 200V-1000V
Max Output Current:
250A Per Gun
Charging Ports:
2 (dynamic Power Sharing)
Protection Grade:
IP54
Operating Temperature:
-30C To +55C
Cooling Method:
Intelligent Air Cooling
Connector Standards:
CCS1, CCS2, CHAdeMO, GB/T
Communication:
OCPP 1.6J Over 4G / Ethernet / WiFi
Display:
10 Inch Colour Touchscreen
Highlight:

180kW DC EV Charger

,

0.99 power factor EV charger

,

low harmonic DC fast charger

Product Description
MINOR SNOW SERIES · POWER QUALITY · 180kW
Minor Snow 180kW DC EV Charger 0.99 Input Power Factor Low Harmonic Grid Friendly Industrial Park
A 0.99 input power factor front end with low harmonic distortion, engineered for industrial park grid access rules and for sites that would otherwise carry harmonic penalty charges.

Product Overview

Most DC chargers are specified on output power and connector count, while the input side determines whether the site can actually be approved and whether the electricity bill carries extra charges. The CLF-DC-180G uses an active front end with a 0.99 input power factor and low total harmonic distortion, so the current drawn from the grid stays close to a clean sine wave instead of the distorted waveform produced by conventional six pulse rectifier front ends.

For industrial parks, that difference decides whether the charger can be connected at all. Park grid codes and utility connection agreements commonly cap harmonic current injection at the point of common coupling; a charger that exceeds the limit forces the operator into filter retrofits, derating or refusal of connection. This unit is designed to stay inside those limits with margin, so approval drawings pass without extra mitigation equipment.

Key Selling Points

  • 0.99 input power factor — Active front end control keeps the power factor at 0.99 across the load range, minimising reactive current, cable and transformer sizing and avoiding power factor penalty clauses in industrial tariffs.
  • Low harmonic distortion — Harmonic current injection is suppressed at the source rather than filtered afterwards, so the charger does not disturb other equipment on the same park transformer, including PLC lines, welding sets and sensitive metering.
  • Meets industrial park grid access standards — Designed against the harmonic limits used by industrial park connection agreements and local utility codes, supporting faster electrical approval and avoiding harmonic penalty charges from the utility provider.
  • Stable operation on weak park networks — Wide input voltage tolerance and active current limiting keep the unit running on networks with high source impedance, where passive front end chargers trip on undervoltage during peak load.

Minor Snow 180kW DC EV Charger 0.99 Input Power Factor Low Harmonic Grid Friendly Industrial Park

Minor Snow 180kW DC EV Charger 0.99 Input Power Factor Low Harmonic Grid Friendly Industrial Park

Minor Snow 180kW DC EV Charger 0.99 Input Power Factor Low Harmonic Grid Friendly Industrial Park

Technical Parameters

Model CLF-DC-180G
Series Minor Snow
Rated Power 180kW
Input Power Factor 0.99 (full load range)
Input Current THD Low harmonic design, active front end
Input Voltage AC 380V ±15%, three phase five wire
Output Voltage DC 200V - 1000V
Charging Ports 2 (dual gun, dynamic sharing)
Max Output Current 250A per gun
Protection Grade IP54
Operating Temperature -30°C to +55°C
Cooling Intelligent air cooling
Communication OCPP 1.6J, 4G, Ethernet, WiFi
Display 10 inch colour touchscreen

Why Power Quality Sells In Industrial Parks

A 180kW charger without power factor correction draws reactive current that must be carried by park transformers and cables, and injects harmonic current that heats neutral conductors and distorts the voltage supplied to other tenants. Both effects are billed back to the site owner through penalty clauses, transformer oversizing or forced mitigation. A 0.99 power factor active front end removes that cost line from the project business case.

Typical Applications

Industrial parks and factory sites with tenant electricity metering, logistics parks sharing a single transformer with production loads, science parks with strict connection agreements, and any site where the utility provider has already issued a harmonic warning to the owner.

About McKee

Mckee is a manufacturer focusing on electric car charging stations and related electric car accessories. Committed to sustainable development since 2011, we constantly aim to adopt clean and green technologies, striving to provide safe and green energy services through technological innovation. We provide complete electric vehicle charging solutions, from innovative energy storage technology to public DC fast charging stations, fast charging stations and portable charging stations for home use. Our infrastructure can meet every type of demand.

Minor Snow 180kW DC EV Charger 0.99 Input Power Factor Low Harmonic Grid Friendly Industrial Park

Frequently Asked Questions

How long is your delivery time?
For charging posts, it is usually 3-10 days. If there is no stock, the production lead time is determined according to the order quantity. High-power DC charging posts usually need to be customized according to the customer's technical parameters.
How long does it take to customize the prototype?
For charging piles, the prototype time is usually 7 days. For DC charging posts, the prototype time is usually 15 days. For high power fast charging stations, the technical parameters need to be determined before production, and the prototype time is usually 30 days.
How to guarantee the service?
Our products are divided into two categories: household and commercial. For home chargers, we provide standardized service: 1 year warranty + remote installation and usage guidance + video installation tutorial. For commercial chargers, we provide both standardized services and payment software docking services for operating companies.
How do you guarantee the quality of your products?
The charging post products we sell have passed GB certification in China and CE certification in EU. For some other countries, the relevant certifications are in progress.
Additional Information: OEM supported. Any requirement please contact us to talk about the details. We will reply to your inquiry within 24 hours. The above for reference only, final price determined by charger KW - please contact us for accurate quote.