| Brand Name: | Mckee Charging Cube |
| Model Number: | CLF-DC-160-240KW |
| MOQ: | 1 Piece |
| Price: | Negotiate |
| Packaging Details: | Export wooden case with moisture barrier and shock absorbing base, accessory box for cables and documents |
| Payment Terms: | T/T,L/C,D/P,D/A |
For operators who need high turnover at every bay, the Bailu series 160kW / 240kW DC charging pile splits its installed power across two guns and hands full output to a single vehicle when the second bay is free. A 10 inch high brightness touch screen, four start methods and OCPP 1.6J over 4G, Ethernet or WiFi make it a complete commercial platform rather than a standalone cabinet.
| Power | 160kW / 240kW optional |
| Input Voltage | 380V ±15%, three phase |
| Output Voltage | 200-750V DC |
| Max Output Current (single gun) | 200A (160kW) / 250A (240kW) |
| Working Frequency | 50Hz ±10% |
| Power Factor | 0.99 |
| Peak Efficiency | 96% |
| Cooling Method | Forced air cooling |
| Protection Grade | IP54 |
| Operating Temperature | -40°C to +60°C |
| Connector Standards | CCS1, CCS2, CHAdeMO, GB/T |
| Gun Configuration | Dual gun, balanced power sharing |
| Display | 10 inch high brightness color touch screen |
| Communication Protocol | OCPP 1.6J |
| Network | 4G / Ethernet / WiFi |
| Cable Length | 5M standard |
| Certification | TUV, CE, FCC |
| Place of Origin | Luoyang, China |
Cabinet colour and branding, interface language, connector combinations, cable length, payment terminal integration and back-office protocol configuration can all be customized. Our engineering team supports drawing approval, factory acceptance testing and commissioning guidance for fleet and CPO projects.
Mckee has focused on electric vehicle charging systems since 2011, covering AC wall boxes, portable charging plugs, DC fast charging stations from 60kW to 360kW and split charging systems. Products are TUV, CE and FCC certified, and OEM/ODM projects are supported with customized branding, connector configuration and communication options.
Send us your site power capacity, required power level and connector standard, and our engineering team will reply within 24 hours with a configuration proposal and quotation.
![]()